Naperville Warehouse

Naperville, IL · 2025
Category
Commercial
Year
2025
Duration
11 business days
Area
80,000 sq ft
Overview

Full TPO membrane installation on a large logistics warehouse. The project was completed in phases to maintain 100% operational continuity for the client’s 24-hour distribution center.

Challenge

Roofing over an active cold-storage facility required precise temperature-controlled adhesive work and strict scheduling to avoid any product loss.

Specifications
  • 60-mil TPO Membrane
  • Tapered Insulation System
  • Enhanced Drainage Layout
  • Mechanical Fastening System
  • 20-Year System Warranty
Client
Midwest Logistics Corp.

We never had to pause a single shift. Absolutely seamless from our side of the operation.

— Operations Director, Midwest Logistics